Separation between tenant lobby and conference areas was needed.
The floor needed to be reconfigured due to the tenant giving back space. Both tenant and common building areas required changes.
Work was done in a densely populated, Class A office space during tenant work hours.
Solution
Clarion glazing specialists provided shop drawings and field measurements for new glass wall. Glass was demoed from different locations in office and refitted/installed into new openings between existing glass panels. New glass doors were installed to match existing glass. Finished product was refilmed making new and existing glass blend seamlessly.
New walls were built to redesign tenant breakroom and create a new common corridor for the building.
Clarion Project Manager worked closely with tenant to allow full office staff to remain working during construction.