Olivet Nazarene University

Challenges New glass entry way Tired and outdated ceiling needed a cost-effective re-fresh School setting had unique needs Solution New school...

NAI Hiffman

Challenge Corporate office required high-end finishes and a variety of custom features throughout space. Changes needed to be...

McMillan Doolittle

Challenge Floor coring work needed to be done to the second floor of the building. Building...

American Family Insurance

Challenges The previous tenant was a data center. Project required more than typical demo and floor re-construction to prepare...

Insight Global

Challenges The tenant moving into this space was located out of state. The space was designed...

Emerson Appleton

Challenge Separation between tenant lobby and conference areas was needed. The floor needed to be reconfigured...

Advocate Health Care

Challenges Build out was on the second floor of a building that did not have a freight elevator. ...

1200 Arlington Heights Rd

Challenge The vacant suite needed to be left in a state that would attract potential tenants. ...